Latest from the Jim Cutler Blog

Poster-jfk-bridge

EXPLORE: VIDEO OF JFK BRIDGE REMOVAL IN 90 SECONDS.

Dawn and I shot this video for Gramercy of the bridge removal (270 tons) at JFK. First a giant beam had been installed inside the structure for the lifting cranes to hold onto. Each massive crane was manned by it’s own operator, who remained in constant radio contact crane-to-massive crane. It was like watching a coordinated dance. They […]

read more

Read Full Blog